• News & Insights
  • Contact Us
WW Humble Supporters

RD Summary

ARDAK derived the wrap rate multiple (multiple of G&A, overhead, and fringe, without regard to fee or material handling costs) for both plant and site work for each competitor identified.  Prior year rates will be provided (if available), AND assessments of trend data and accuracy believed achieved will be provided. Wrap Rate Derivation (RD) Summaries are available for each Wrap Rate type (Composite: CMP, Engineering: ENG, and Manufacturing: MFG). ARDAK currently maintains the following RD Models:

1.     Standard Composite DoD / Civil Cost Basis

2.        State & Local

3.     Engineering Services (ENG)

4.        Manufacturing (MFG)

5.     Intelligence Community (IC)

6.        Commercial

7.     Joint Venture (JV)

8.        Foreign

9.     Predictive (Estimating out years)

10.     Notional (Forecasting Effect of M&A’s or potential contracts)

An exemplar of a Standard Composite DoD / Civil Cost Basis Wrap Rate is shown on below:

KBR RD Summary Image ONLY